This blog is geared towards students entering the construction industry
Sunday, August 22, 2010
Footing Rebars
The process for tying rebar for the isolated footings is:
1. Lay the bottom mat on the PCC
2. Tie the vertical rebars to the bottom mat
3. Place the stirrups around the vertical rebars
4. Tie the top mat of the footing
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)