Plant and Machinary Required at Construction Site for Civil Works

1. Diesel Generator for electricity of site office, area lighting, water pump,machinary, etc
2. Water Pump for drawing water from the boring well
3. Excavator
4. Rebar Cutting Machine
5. Rebar Bending Machine
6. Dewatering Pump
7. Hydra Crane of 12 T
8. Tractor with Trolley for moving shuttering material
9. Vibration Plate Compactor for back-filling of soil
10. Total Station for determining levels and aligning columns with each other
11. Tower Crane for height work
12. Batching Plant for making concrete
13. Concrete Pump
14. Field Junction Boxes and lots of cables for lighting

Management Structure of Construction Site

The typical management structure of a project at site would be:

1. Project Manger
2. Civil Engineer
3. Mechanical Engineer
4. Electrical Engineer
5. Plumbing Engineer
6. Store Manager
7. Quality Manager
8. Safety Manger
9. Time-office Manager
10. Admin and Accounts